MOTAS delivers sand backfill system for Fehmarnbelt tunnel project to Neptune

Overview delivery

IJmuiden, The Netherlands – MOTAS Dredging Solutions has recently delivered the complete component package for the 800 mm pipe diameter sand backfill installation for these works by the Femern Link Contractors joint venture (FLC).

The order was awarded by Dutch shipyard Group Neptune Marine who are the builders of the large spreader pontoon with crew accommodation and integrators of the backfill system.

“MOTAS Dredging solutions offers the complete backfill installation package. From concept design, engineering, fabrication, quality control and transport to installation supervision at the builders’yard”

The spreader pontoon and installation is designed for the accurate back filling of sand on top of the up to 200 meters long tunnel elements after their placement in the tunnel trench, reaching water depths over 40 meters. The system and components design reflect the special care paid to avoid damaging the elements. This immersed tunnel solution is of a unique scale in terms of length and water depth.

We are very pleased to continue our cooperation with the versatile Neptune Marine Group, for over 50 years known for their reliable, flexible and high-quality maritime solutions.

FLC is the joint venture in charge of the Design & Construction of the immersed tunnel, the tunnel portals and ramps for the Fehmarnbelt project.

Besides the design and engineering of this backfill system the package constitutes of construction and supply of the following components:

  • Dredging pipelines (on topside)
  • Dredging ball joint
  • Density and velocity meters
  • Overboard backfill pipe system with gimbal joint
  • Rubber discharge hose
  • Angle transmitter sensor
  • Approx. 30 tons Diffuser head

Customer assistance

Our product portfolio, combined with expert technical advice and on-site support, makes us the perfect choice for all your dredging installation needs. For these and other dredging installations our staff can help you make the best material choices for your project and advise on improvements.

Contact us via telephone: +31 85 13 00 795 or e-mail: info@motas.group today.

Figure: Backfill system topside and hoist pipe mounted
Figure: Hoist pipe
Figure: Pipe line parts

Keywords:

  • Design
  • Engineering
  • Fabrication
  • Dredging installation components
  • Backfill system
  • Diffuser head
  • Fehmarnbelt
  • FLC joint venture
13 replies

Trackbacks & Pingbacks

  1. achat kamagra generique

    kamagra prescription de s en ligne

  2. koupit kamagra v sydney

    výhody nad kamagra

  3. ordering itraconazole buy adelaide

    purchase itraconazole generic australia

  4. discount fildena us pharmacies

    purchase fildena canada medicine

  5. gabapentin online no prescription overnight

    order gabapentin canada price

  6. discount flexeril cyclobenzaprine canada how to buy

    buy cheap flexeril cyclobenzaprine generic online mastercard

  7. order dutasteride cheap info

    discount dutasteride uk online pharmacy

  8. buying avodart cheap fast shipping

    buy avodart in London

  9. ordering staxyn generic information

    cheapest buy staxyn cheap discount

  10. ordering xifaxan generic new zealand

    online order xifaxan united kingdom

  11. ordering rifaximin generic does it work

    how to order rifaximin cheap canadian pharmacy

  12. online order enclomiphene canada medicine

    buy enclomiphene online without a prescription

  13. discount androxal generic drug

    purchase androxal france where to buy

Comments are closed.